Collective success of Minsk subway builders and «SMAZKA.RU» LLC (industrial dept of «VMPAUTO»)
Feb 22, 2017
< 1 min read
588 views
Succesful passed 1000’th ring of Minsk subway tonnel. TBM BESSAC “ALESYA” work with soil conditioner KRP-2 by”SMAZKA.RU” LLC.
KRP-2 is designed to easing the work of Tonnel boring machines (TBM). Foam reagent is mixing with water and air and then fed to the rotor to loosen the soil.
The local news